Logo 2019.png

Zandi Architects 

Design, Planning, Building Control

Contract Administration

  • Home

    • About
    • Testimonial
    • Team
  • Services

    • Feasibility Studies
    • New Build
    • Refurbishment
  • Projects

  • Blog

  • Contact

  • Testimonial

  • Privacy Policy

  • File Share

  • Members

  • More

    Use tab to navigate through the menu items.

    info@zandiarchitects.com

    +44 (0)208 555 7709

    • facebook
    • googlePlaces
    • twitter
    • linkedin
    • All Posts
    • PD
    Search
    Shahrokh Zandi
    • Aug 13, 2020
    • 1 min

    New permitted development: How long do I have to do the works?

    Development must be completed within 3 years from the date prior approval is granted in accordance with the approved details #NewPermittedDevelopment #Architecture #Residential #Homeimprovement
    12 views0 comments
    Shahrokh Zandi
    • Aug 13, 2020
    • 1 min

    New permitted development: Is there a fee?

    As it stands, fees are not payable for prior approval applications of this category. However, it remains to be seen whether a fee will be introduced. However, it remains to be seen whether a fee will be introduced. #Homeimprovement #NewPermittedDevelopment #Residential
    5 views0 comments
    Shahrokh Zandi
    • Aug 13, 2020
    • 1 min

    New permitted development: Are any approvals needed?

    Yes, you must apply for the “prior approval” of the LPA in relation to the following factors: the impact on the amenity of adjoining premises including overlooking, privacy and the loss of light external appearance, including the design and architectural features of the principal elevation and side elevations fronting a highway air traffic and defence asset impacts and certain protected views Before beginning, you must also provide a report on construction management, coverin
    2 views0 comments
    Shahrokh Zandi
    • Aug 13, 2020
    • 1 min

    New permitted development: Are there any limitations or restrictions?

    The rights do not apply to: buildings converted to residential under permitted development rights conservation areas, areas of outstanding natural beauty, the Broads, national parks, world heritage sites and SSSIs buildings constructed before 1 July 1948 or after 28 October 2018 where the existing dwelling house has been enlarged already by the addition of one or storeys whether under permitted development or otherwise There are other restrictions: following the works, the he
    11 views0 comments
    Shahrokh Zandi
    • Aug 13, 2020
    • 1 min

    New permitted development: a right to add new storeys to your home

    What is the new right? From 31 August 2020, a new permitted development right will allow you to construct up to two additional storeys to dwelling houses consisting of at least two storeys, and one additional storey to one storey dwelling houses. The new storeys must be immediately above the topmost storey. The right also covers any engineering operations reasonably necessary for construction comprising works within the curtilage to strengthen existing walls or foundations. T
    9 views0 comments

    Zandi Architects

    E: info@zandiarchitects.com

    T: +44(0)208 555 7709

    M: +44(0)7766 734625

    A:  158 Burford Wharf, 3 Cam Road, London, E15 2SS

    Privacy Policy

    • LinkedIn
    • Facebook
    • Twitter

    Company No: 08002408
    © 2020 ZANDI ARCHITECTS LTD.